Construction inventory management
Construction inventory management is a means by which construction companies and suppliers can keep track of materials, workforce, equipment and plant. This is particularly important when a construction company has multiple projects to manage, as efficient scheduling can become very complicated.
A well-managed inventory can be critical to profitability as delayed, misplaced or lost items can incur avoidable delays and unnecessary costs. A project timeline, planned in advance, with a full inventory of the required materials, labour, equipment and so on is a vital part of the project planning process.
This might also include:
- An inventory of tools, including manufacturer details, instructions, parts requirements, and so on.
- A consumable inventory (i.e. nuts, bolts, screws, nails, drill bits, wire, batteries, and so on) with a system that alerts when supplies are lower.
- Automatic scheduling of preventative maintenance for tools, plant and equipment, helping to ensure that unnecessary down-time for repairs is avoided.
- An inventory app, downloaded to operatives’ phones.
- Radio-frequency identification (RFID) and barcode solutions.
For more information see: Logistics management.
[edit] Related articles on Designing Buildings
- BSI construction product identification system.
- Construction logistics manager.
- Consumable.
- How to manage construction plant.
- Inventory.
- Logistics management.
- Materials on site.
- Planned preventive maintenance.
- Off site materials.
- Resource management.
- Scheduling construction activities.
- Site storage.
Featured articles and news
Download your free guide.
Four new types of prior approval for solar developments
Online Planning Portal application types from 5 September.
Election fails to spark construction industry revival
Contract awards and planning; post election.
Making diversity and inclusion easy for SMEs
The CIOB tool for companies with limited resources.
Sustainable Futures: Redefining Retrofit for Net Zero Living
BSRIA Briefing 2024, initial speakers announced.
Looking back at the UK's first Passivhaus leisure centre
Reflections on St Sidwell’s Point with CIAT.
A-Level results and electrical apprenticeships
Electrical Skills Index highlights areas with skills shortages.
One of the world's more unusual drive-throughs.
A quick introduction.
Hadrian's Wall Path and the national trails
The trails are heritage assets in their own right.
Articles on timely advice and hydraulic lime.
Building Designers Association of Australia
CIAT and BDAA sign Memorandum of Understanding.
Built Environment Inclusive partners issue statement committed to inclusion.
Building regulation requirements can have unintended consequences.
CIOB announces 2024/25 vice president
Sustainability champion Professor Saul Humphrey.
Accelerating towards a net-zero built environment.